Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 04/19/2018 in all areas

  1. 1 point
  2. Well its all welded up and welds sanded , have welded a strap across the top and a strip across the front with 4 bolts welded in and will use wing nuts on there to secure it . Then welded the tabs on the bottom for the fixing holes through the floor once I've settled on the location I will drill the holes through the floor using those holes as guides then weld some m10 bolts in them that way I can remove it myself which is a bonus , but I will still use 2mm plate as a load spreader underneath . Then a test fit It hangs over quite a bit so II think that I've decided that I will push it up against the seat like were it is in the photo then doctor the tool box it will just require me to cut the lid just in front of the frame then tack it to the box , luckily it just misses the hinge , then its on to the paint . cheers Ian
    1 point
  3. I've been and gone and done it!...... IVA application goes in the post tomorrow. Mike
    1 point
  4. Have you pulled the CV joint through the stub axle as far as it'll go? It is floating until the hub and drive member go on and hold it with a circlip
    1 point
×
×
  • Create New...

Important Information

We use cookies to ensure you get the best experience. By using our website you agree to our Cookie Policy