The material for the bellows is off to be measured and worked out the best course of action as a suitable replacement.

 

Personally i would like a breathable modern tent material, however the original was a pvc type with a lining on the inside ( similar to the actual lining on the GRP interior ) but it was on it's last legs.

IF, and it's a big IF, i went along the route of the original pvc for the strength of the joints to the landy roof then i would look at a lining ( originally came with ) to reduce any condensation as well as fitting a shroom vent.

 

The original material is crudely held in place with aluminium strips sandwiching the material between these and the roof and then screwed into the roof of the vehicle.

I will look at better ways to seal this joint as it's pretty basic, but it did work!

Link to comment
Share on other sites

  • 2 weeks later...

A little progress today, roof struts and repair patches to the GRP roof inside.

 

i did fit some gas struts but they didn’t work as planned.

Gas struts don’t lock themselves into a pre defined position either, if I did use them then i’d need to come up with a locking rod of some sort, I dropped the idea and went back to the original spring loaded arms, which after 47 years are still in good working order.

 

ive created a timber bracket to hold the struts and to take the bunks, I will drop it down to my steel fabricator and get him to fashion replicas out of box section.

D6ECAF34-59FD-47E9-88A6-EBDB6FB7AB36.thumb.jpeg.ee381871cb5ebcc07acbc75b843d9990.jpeg

DD2C54DE-EC43-4BA7-8A97-EB443C623242.thumb.jpeg.b2845aac8ebff20c169a4f6155e31802.jpeg

 

and my my assistant for today was Millie looking her best....

 

B55D8F72-F212-4D7C-AEE7-31BCFE097CBD.thumb.jpeg.a33057c53c33325d307ec2ef621ac7ba.jpeg

 

 

  • Like 2
Link to comment
Share on other sites

  • 1 month later...

It isn't at the moment due to work but there will be some time soon to start on it again as the work project is coming to an end.

 

I've cleared the workshop out ( again! ) to put the Landy in at the weekend and replace the cracked windscreen.  Once that ( and fixed the non working wipers ) has been done, i shall be moving the frame and roof back inside and spending some quality evenings tinkering and moving forward with it :)

 

I do find dark evenings and working in the worshop with the radio on quite a satisfying way of life...

 

Link to comment
Share on other sites

  • 2 months later...

Work has a strange ahbit of getting in the way of everything else, including this build.

 

A rare week off ( ie turning my phone off after finishing the last contract over christmas ) has allowed me to revisit where i left off.

 

Firstly, the frame work that the roof sits on has been lowered so i can now open the roof whilst inside the garage.  The other bonus to this is when i'm stood on the floor in the garage inside the framework, it's the same height as when it'll be on the Landy, so i get a good perspective of what everythign will look like.

 

Turning my first attention to the roof itself, i needed to replace the old batons which form the rail that the bellows fix too.  For this i've used phenolic 18mm plywood ripped down to 30 mm strips.  This stuff is pretty good as it's BB rated plywood to begin with, but it now has a finished, tough as nails, waterproof face.  you can buy it as ' buffalo board ' and it's used in lorry trailers as they're base and a multitude of other things.  As long as you seal the cut edges, it's nigh on waterproof.

 

Top piece is the original, bottom 2 are replacements.

 

IMG_0112.thumb.jpeg.b6522cc7f29d8daccc7a968bc670719b.jpeg

 

 

 After replacing the rotten batens ( mainly the one nearest the hinge which gets the least amount of air/sun etc ) it was time to fix them into place. 

Originally they were held in place with fibregalss matting and resin, and over time they have moved somewhat and come unstuck.

This time i've fixed them into position with CT1 which is an adhesive used by the Royal navy to replace rivets in battleships and to stick just about anything to anything else...( i lied about the Royal Navy! )

This stuff is good.  It can be used to stick concrete blocks to steel as part of tying it in when building a wall, it is that strong, so in my case i'm quite happy with it keeping the timbers in place, however i will be adding some more fibre glass and resin after the next part.

 

I will be ( tomorrow hopefully ) insualting the roof with some wadding and cutting 2 sheets of 9mm plywood ( not phenolic, just structural ) to cover the unsightly roof area.  This will give some rigidness to the entire roof and allow me to fix lightweight objects ( lights, tinsel, snowglobes etc ) to the roof without going into the actual grp roof. 

 

Once the plywood is fitted, i will seal around the edge again with fibreglass matting and resin and then fit the bellows, but i'll cover that a little later on.

 

Ta

Link to comment
Share on other sites

Reading back, i haven't mentioned that i have had a replacement material made for the bellows.

 

This stuff is used for boat covers, is UV reisistant, waterproof and is a maroon colour....or purple...abit like an aubergine, but it changes colour when you look at it from a different angle.

 

Anyway, i like it so pics tomorrow.

Link to comment
Share on other sites

Copious amounts of insulation fixed to the roof in the wee gaps caused by the shape of the roof itself.

This is being flattened with a multitool and covered with a plastic sheet to eliminate condensation coming through onto the plywood which will be the base for the ceiling finish.

Around the window areas i will need to come up with a finish of some sort...

 

IMG_0409.thumb.JPG.a54f7f3fa7a8fa7a6461e65620b33dd2.JPG

Link to comment
Share on other sites

A busy day today after our little jaunt of 750 miles to pick up a trailer tent for the wife on thursday ande landy behaved beautifully.

 

The roof has been DPM sheeted and plywood covered now so it's ready for the resin ( when it arrives ) to seal the edges and finish that little job off.

 

Today i concentrated on the material, mainly fitting the press studs which allow the inner framework to attach to the material.

It's a simple process and i've been assured it's waterproof as the hole created is sealed up when you combine both parts with the die and whack with a hammer.  I've fitted a small thin leather disc on the back to help

 

IMG_0419.JPG.5d0bc6135dc1725b2f860ce9c547fb00.JPG

IMG_0418.JPG.9668d077709438aa1810cbcba8f2a7e3.JPG

 

 

IMG_0417.JPG.aa12167e61ed4b55d88fe87166bc1f95.JPG

 

After these were fitted to the front elevation, i clipped them in and this is where the fun begins!


 

 

Link to comment
Share on other sites

The roof is obviously not built for a Landy, it was built for a Bedford van, so it's too long, too wide and an odd shape for the roof of the landy.


To get it to open and close correctly means adjusting everything more than once.


Firstly i took the measurements of the original spring arm which allows the roof to raise and lower from the bedford and transferred that to the landy.  This was a starting point from which i could begin to move things around to get everything to open and close correctly.


Fitting the material allows me to work out how high the spring arms need to be and also how far along the brace they are to be positioned.  The roof slopes backwards to the rear of the landy which means the 2 arms are different heights when open and this means they are at different angles too.


Fitting the material shows the height at which the arms can be at their maximum, hence fitting it at this stage so i could work this out.

I fitted it temporarily inside with wooden fillets screwed through the material and into the timber brace around the wood.

In place it looks like this;

IMG_04212.jpg.a953f22010c0ea7f5a4f4e0f733753d7.jpg

 

On the sides, you can see the chalk lines which represent where the original pvc covers were attached to the bedford roof.

IMG_042.JPG.9f616aaa8f5b593c399a1daee66b455b.JPG

 

Now to get the exact height of the arms, i need to fit the base of the material to the roof and here is where it gets a little more complicated, but this time it's because my brain is working at new ideas and isn't content with the norm


Before i get to the that part, let's keep on track.


The material was held down with aluminium strips, a little rudimentary to say the least, but it worked with the pvc covers originally fitted.


Digging out the old strips ( i kept them ) they were a little on the, shall we say, bent side?

IMG_0428.JPG.4f1e08f58015adbfbb75919ef5814ccd.JPG

 

So they needed a little persuasion to get straight again.


a straight piece of wood to screw to, a hammer and another piece as a buffer so as not to damage the alumium too much and away i went.  I screwed it onto the stright edge and persuaded it with the hammer to straightened them out

 

IMG_0431.JPG.f16f7d470174ad905f43bdc3896b5b22.JPG
and thus ended up with a straight piece;

 

IMG_0433.JPG.0c266fde852b437e529042ee1b15e5d6.JPG

 

All good there.  

 

These are supposed to be fitted like this to the material ( ignore the lower one, that's being stored in the guttering for a minute )

 

IMG_0435.JPG.8a14f7d473771d7f4461474f071385e9.JPG

 

Back in the 70's, this was considered a good idea and with pvc i can see the attraction to the manufacturer of said roof, but in this day and age, it's not going to cut it.

 

So i need to come up with a better idea and to start with, i'm going to create a drip edge by attaching a piece of phenolic ply to the roof and then fix the aluminuim strips to the inside of the bellows thus removing all traces of a join or an area where the material is sandwiched and can gather water on the outside

 

i didn't take a picture of this, but will do in the future when i begin to do it.

 

The bunk also had to be temporarily fitted so i have an idea if the bellows, spring arm or anything else will foul it or it will foul them

IMG_0427.JPG.1ab359eafc1a17834e3e6712cf389639.JPG

 

It doesn't at this stage, however i may fit it on the other side...depends where i put the cooker/sink eventually.

 

If you're still here, then you may remember me mentioning my brain going off on one, and here is the idea. 

 

I like the dormobile design, it's alot bigger inside than any other pop up design as it gives full head height from behind the front seats to the rear door with no obstruction. This is great fro manouvering inside and sleeping arrangments are easier too.

However....

I like the idea of this;

IMG_0438.JPG.40bda8e7038e0ac500381ece3d798c38.JPG

 

Ignoring the clamp!  That's just to highlight the idea. 

 

I want to be able to lift up the bellows so we can provide a view out of the side on nice sunny days. 

 

When i was looking at the way to fit the material to the roof it came to me that after it was secured to the roof with my drip edge technique, then if i were to fit a strong waterproof zip at this point (finger pointing in direction )

IMG_0436.JPG.eb8f862d01763f67d335b7f69d728907.JPG

 

all the way around, i could technically, on a nice sunny day, unzip it and lift the material out of the way, thus creating a convertable, pop up roof!

 

How rock n roll is that!

 

Now to google tent zips.............

 

  • Like 1
Link to comment
Share on other sites

After a few hours plunging into the depths of google and its wealth of information regarding waterproof zips, I’ve put that idea to one side.

Waterproof zips are expensive.  Also they come in off the shelf sizes up to 1100mm which is standard for dry suits (larger sizes ) which isn’t viable for what I want.

 

the alternative is to use a cheaper water resistant zip and have a storm flap sewed onto the material with a Velcro strip keeping it closed.  This is viable but I’m not into making more stitching to the material at this juncture.

 

I’ve come up with an alternative though, which puts the drip edge and the ability to fold the material up out of the way all into one idea.

 

I’ll do a mock up later and show the result 👍

Link to comment
Share on other sites

The idea has worked to a degree, it will need some bits ironing out, but all good 👍

 

I have created a timber frame around the opening of the roof and another sub frame which attaches to the material. 

 

When closed it will incorporate twist and lock latches and rubber seals to keep the elements at bay

 

here is a cross section i made up of some timber to show how the 2 seperate parts are;

 

 

IMG_0114.jpeg.7181127ddedaa1eff4a84256381ca1ec.jpeg

IMG_0115.jpg.fa4f4438cbfa51ae8c99a978f20ffb65.jpg

 

 

 For the drip edge i found some electrical conduit cut with a quarter section out and fitted to the outer edge allows the material to be ' cushioned ' at this point and gives the material the drip edge it requries.

IMG_0117.jpg.6c5605b6dd20d9eef7247748cf0c1902.jpg

 

 I haven't got any more pictures other than this one which shows how the entire material sits off the roof now when it's shut.

 

IMG_0118.jpg.fe70ec2bdcb53540b3663d3a211edee1.jpg

 

The material isn't tight at all, in fact it's just tucked under at this point.

 

I'll get some more pictures up as i go along to give a better idea

 

Please note, the timbers used so far are mock ups and not the actual finished article ;)

 

With regards to latch's, i came up with these;

9456-1.jpg.799c3a420926d63fdfb29776aeca3f14.jpg

 

 I was going to use recessed draw latch's, but as it's going to be in a Landy, vibration could be a problem.  With these ones, there is no chance of it ' popping '  open.

 

I found a neoprene seal which is about the right width and thickness...compressed it'll be about 3-4mm.

 

285018504_Screenshot_2020-01-12Drawing-SEN4072DRpdf.thumb.png.5ab6c9645c35fc38fa244dfb0d6919b9.png

 

 Tomorrow i'll shift the whole hinge section for the bellows up and forward slightly as well as trim the timber near the hinge side to stop fouling.

 

It'll be time soon to break out a welder...once i've figured out how to use it ;)

  • Like 1
Link to comment
Share on other sites

Why is it when you're on a roll, something turns up and you end up doign soemthign completely differetn?

 

Finally managed to clear the workshop and get rid of 2 trips to the tip's worth of stuff, but in the meantime i did manage to resin the edges of the internal timbers and get the internal grp all sprayed up.

 

Next on the list is to re spray the entire roof in Buckingham Blue, the same as the truck itself.

I'm ordering some paint from Ebay ( https://www.ebay.co.uk/itm/RANGE-ROVER-BUCKINGHAM-BLUE-796-2K-SOLVENT-BASECOAT-CAR-PAINT-MIX-READY-FOR-USE/303252110700?hash=item469b3bfd6c:m:m1Yp1JwaQ_SJkfStkyyzcwg )  which look sok for what i want.

I've nto done this sort of thing before so it'll be a learning curve.  I'll keep you posted with some pics as i go along ;)

Link to comment
Share on other sites

Progres !!

Good Progress.

Well Done.

I haven't touched that roofpanel yet as work and the Red Hybrid get in the way.

However, it WIL be finished before September.

  • Like 1
Link to comment
Share on other sites

Whilst waiting for the roof paint to arrive, I figured I’d do things a little backwards and finish the interior roof of the GRP shell.

The main roof was wheeled outside for some room and it was time to start 

Firstly was the introduction of a spinning vent in the roof. When travelling with dogs ( big ones as well ) they tend to pant a lot causing moist air to accumulate in the Landy so I wanted to fit one of these vents to help with airflow inside.

Drilling a 100mm hole in a perfectly good roof is definitely a measure twice three times and drill once moment and in case you’re wondering what that looks like, here’s a picture

3758BE96-D666-4EB4-865D-C67C619F386A.jpeg.a9721d924d5b8854da5ae4e36e910dcc.jpeg

 

It was drilled in the only place possible but in hindsight, it could’ve done with being on the other side of the central rib due to the light position which I worked out after I drilled the hole.

We live n learn

 

The internal ‘ceiling ‘ was lined with wadding to soften it and I fixed the cables for the lighting at this stage too.  1 flexible necked light in each upper corner and a single 1metre strip light along the middle

 D3E27DFC-187C-4530-AA9D-23378F282743.jpeg.5021c3d47bf9c2baa747289ca8bcebf4.jpeg

 

I also sleeved the vent hole to stop moisture being introduced to the insulation of the roof with an old aluminium pipe carrier I cut up

789D58ED-3E71-4366-AF01-5ABDF98F14BC.jpeg.d7054b03fa7b1d2cb6d9a29facd716db.jpeg

here’s another wadding picture

 

938B0A28-1894-489A-BACD-D2C4024695C7.jpeg.7392de618ca253fa92220259158062f4.jpeg

 

After the wiring and wadding was done it was time to fit the carpet

 

18B19B17-B359-4E29-9147-DC99FE9C502C.jpeg.a378c549a5bdb9d797876648fa41e316.jpeg7E9BA026-2C0A-4886-AB74-A4B70F3B2151.jpeg.d66511faadd83abf57a4426e8c7d4f00.jpeg

 

This is my first attempt at this sort of thing and the result is alright.

 

The larger windows around the edges needs tidying up as they don’t come with surrounds like the smaller ones, but I’ll come up with something for them.

 

There is a 15mm gap all around the edge which allows the fitting of the bellows to the roof and illl show how that goes in another post

 

745A42D9-8600-4853-BB3D-8819923ECD4C.jpeg

Link to comment
Share on other sites

Ordered some Linear Actuators to replace the spring loaded arms.

Direct size replacement with a 150kg lifting load per arm, the roof being about 65kg and there being a pair, they should be more than adequate.

 

Fitted the bellows material to the roof, lots of silicone adhesive along the joints and fitted the aluminium strip to the inside this time.

This should be pretty bullet proof as much as sticking material to a GRP roof can be!

 

Outside edge;

IMG_0755.jpg.e5c4b8ef963145b5b7ab139ff0232677.jpg

 

inside edge;

 

IMG_0756.jpg.6b97cd8eb713229dc59349c2e02419aa.jpg

 

 

Once the material was done, it was time to redo the timber frame for the base of the material.

 

I used bits n bobs to get the template correct the other day but this time i cut it from a single sheet.  The drip edge was formed using cable conduit with a 1/4ish cut out;

IMG_0757.jpg.91f2f4256da9e4c76beabec972066c2d.jpg

 

 

This then sits on the edge like this;

IMG_0758.thumb.jpeg.bfda67dd057bef06d357534aebb2c5d5.jpeg

 

I also re cut the hinge timber with phenolic ply, that's currently glued and clamped, i'll post up pics when ready

 

 

Link to comment
Share on other sites

A little more wood work progress today. 

The hole in the roof is obviously a large part of the structure gone and other than the overall strength of the roof which will be beefed up with steel box section at a later date, i wanted to stiffen up the roof and allow the bellows frame to sit onto something substantial.

The idea is to follow the curve of the roof and have it ' sandwiched ' between 2 pieces whilst giving it some rigidness for the upper frame work to be latched onto.

 

Using 18mm phenolic BB plywood, i cut the first template out and fitted to get the curves correct or as near as ;)

IMG_0759.jpg.298451240fd8e781603826f028c5a6e6.jpg

 

Obviously this is too large for what i want, so i slimmed it down to 40mm

IMG_0762.jpg.c04d559efb66eb71ca92c2645b647a97.jpg

 

and did another one for the rear

IMG_0764.jpg.c09aeb68127f2ef36325d357dc5d005e.jpgIMG_0765.jpg.84811ddc3830b1ea42321e8d9b718356.jpg

 

Next was to make the top part which is glued and screwed through the roof into the lower part

IMG_0767.jpg.5cda00b336fe5b3ef88c89401f740b7b.jpgIMG_0769.jpg.2115e2b8e376084615598dca1c292cf6.jpg

 

 Firstly you will see the uneveness of the initial roof cutout, so this was grinded off to provide a nice clean finish.

 

At this point i was called away as we had an injured buzzard that needed assistance.  After the vet's visit and settling him at home for the night, i was back into the workshop but didn't take any more pictures.

 

I'll add some tomorrow after i've doen the next bit of woodwork along this opening

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

We use cookies to ensure you get the best experience. By using our website you agree to our Cookie Policy