Jump to content

Powys Lane Repair


Recommended Posts

Powys Lane Repair – Volunteer Project – 19/20 August

Powys Rights of Way department have agreed for CRAG to undertake a repair project on a byway in Mid Wales which is currently the subject of a Traffic Regulation Order (TRO). The route runs west from Pye Corner close to Llandrindod Wells and was closed over a year ago due to the poor surface condition. The project will involve digging some drainage ditches and laying approximately 200 tonnes of stone in the ruts on the lane.

Volunteers should wear boots (ideally steel toecapped), and where possible bring their own hard hat and hi viz jackets together with a good quality shovel and/or rake. The meeting point for signing on will be at SO 136 603 at the Pye Corner end of the lane. On arrival volunteers must sign on and receive a safety briefing prior to joining the chain gang. It is recommended that volunteers also bring waterproofs and a packed lunch.

Start time will be 09:00 on the 19th and 20th of August and volunteers will be able to sign on at any time after this.

For more information please contact powys@crag-uk.org

Link to comment
Share on other sites

  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

We use cookies to ensure you get the best experience. By using our website you agree to our Cookie Policy