JST Posted September 6, 2005 Share Posted September 6, 2005 decided to change the front suspension on the tdi today, well that is repalce the shock turrets with -2" ones for a trial. anyway, drivers side done in 45mins including taking the header tank out etc and fitting new bump stops. passenger side!!!!! 1hr 30mins just to undo the bottom shock nut let alone anything else. on top of that i also noticed (had enough time) that a bit of the chassis looked a little (very) unhealthy near the turret, brake union holder behind the turret mount, so proded it with the screwdriver, and now theres a bloody great hole that will need patching. i think some days you are better just to leave things alone!!!! Quote Link to comment Share on other sites More sharing options...
white90 Posted September 6, 2005 Share Posted September 6, 2005 your welcome to use my Mig welder I can't weld though Quote Link to comment Share on other sites More sharing options...
JST Posted September 6, 2005 Author Share Posted September 6, 2005 cheers for the offer think i should be OK, Peter will prob weld it up for me, he just doesn't know it yet!!!! you can have a laugh when you pop around later. Quote Link to comment Share on other sites More sharing options...
landi41 Posted September 6, 2005 Share Posted September 6, 2005 "i think some days you are better just to leave things alone!!!! " Yup Change the 110 radiator 1/2 hour Change the signal light switch 1/2 day :) Quote Link to comment Share on other sites More sharing options...
white90 Posted September 6, 2005 Share Posted September 6, 2005 I know of an 02 plate chassis for a 90 going very reasonably Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.