Currently I'm carrying out a little change for my 90, out with 3.5 carb with LT85 and in with 3.9 EFI, ZF4 auto and megajolt.
As it is the old engine and gearbox are out. I plan to re-use the LT230 with the auto box and change the ratios and hope the engine and gearbox are a straight swap. There seems to be some who say it is a straight swap and some who put it firmly in the "total nightmare" category. We'll see.
After the old engine was very obliging in coming out without any fuss the "new" engine promptly sheared 2 exhuast manifold bolts off in one of the heads, so if the head is coming off the whole engine is getting rebuilt. Got the injection manifold off today, but it leaves the question of what to get done while I'm taking the engine apart. Uprated cam ? Stage 1 heads ? Injectors cleaned ? Rumour has it the engine had 140,000 miles on it so a rebuild is probably a good thing.
I have an EDIS 8 from the US, coil packs and mejajolt all ready for that long distant time when the new gearbox and engine are in the 90 and I can take the ignition system to a whole new waterproof world. But my current task is take head off and work out how to remove broken studs and try to split engine and auto without flooding gargae in ATF fluid. I'll update this post with how I get on, in case it proves useful to anybody.